Results for Earthwork: 9
Non-licensed Vehicle Road
The project consist of the construction of a section of the NLVR for the 5th runway at Hartsfield - Jackson International Airport in Atlanta, Georgia.
- Duration: 6 months
- Total Value: US$2,000,001 - $4,500,000
- Field:
Heavy Construction, Roads, Earthwork
- Market:
Airport Infrastructure
Dahlberg Plant
The project was located at Dahlberg plant in Nicholson, Georgia. The project included mass excavation, utilities, installed piping, and landscaping.
- Duration: 1 month
- Total Value: Under US$500,000
- Field:
Earthwork Erosion Control, and Utility work
- Market:
Commercial and Institutional Building
Sugar Mill Creek
The project consisted of the Mill Creek Subdivision Phase II for Dekalb Housing Authority. The work performed included asphalt concrete paving, installation of water and sewer system, and erosion control.
- Duration: 8 months
- Total Value: US$1,000,001 - $2,000,000
- Field:
Earthwork, Erosion Control, and Utility Work
- Market:
Commercial and Institutional Building
E.I.T. Embankment and Utilities Relocation Phase I – Taxiway “L” Extension Embankment, Phase II
This project involved construction of various items of work as the first step of the construction of the East International Terminal at the Atlanta's airport.
- Duration: 15 months
- Total Value: US$20,000,001 - $30,000,000
- Field:
Concrete Pavement, Foundations, Earthwork and Taxiway
- Market:
Airport Infrastructure
Sams Lake Wetlands Mitigation
Project consisted of the construction of a wetlands habitat at Sams Lake in Fayette County, GA., along a tributary of the Flint River.
- Duration: 9 months
- Total Value: US$1,000,001 - $2,000,000
- Field:
Earthwork and Erosion Control
- Market:
Airport Infrastructure
Stormwater Detention Basins Maintenance
This project consisted on performing maintenance to the five stormwater detention basins at Hartsfield Atlanta International Airport. This basins collect rain water and regulate the volume of water exiting to natural channels.
- Duration: 5 months
- Total Value: Under US$500,000
- Field:
Erosion Control and Earthwork
- Market:
Airport Infrastructure
Aircraft Rescue and Firefighting Facilities - Phase I
Precision 2000, Inc. hydro-seeded and hydro-mulched the entire area (about 17 Acres) of the site that will be later used as an Aircraft Rescue and Firefighting Training facility at Hartsfield-Jackson Atlanta International Airport.
- Duration: 2 months
- Total Value: Under US$500,000
- Field:
Erosion Control and Earthwork
- Market:
Airport Infrastructure
Non Licensed Vehicle Road (NLVR) Widening and Improvements
Improvement, extension, and rectification of the perimeter way at the Atlanta's Airport NLVR (No Licensed Vehicle Road)
- Duration: 6 Months
- Total Value: US$500,001 - $1,000,000
- Field:
Earthwork, Roads, and Erosion Control
- Market:
Airport Infrastructure
Consolidated Rental Car Facility - CONRAC
Precision 2000, Inc. performed the site preparation for the new Atlanta Hartsfield-Jackson Consolidated Rental Car Facility (CONRAC), for the construction of the Rental Agency Complex (RAC), certain portions of the Automated People Mover (APM) and the APM maintenance and storage facility which are part of the expansion of the airport.
- Duration: 9 Months
- Total Value: US$8,000,001 - $15,000,000
- Field:
Earthwork, Utilities, Sewer Lines, Erosion Control
- Market:
Airport Infrastructure
|