Sidewalks, Driveways and Curbs in Atlanta

This project consists on the construction and repair of sidewalks throught the City of Atlanta.

  • Duration: Annual contract since 2003
  • Total Value: US$4,500,001 - $8,000,000
  • Field: Streetscaping, Concrete, and Pavers
  • Market: Commercial and Institutional Building

 

Airfield Pavement Repair/Maintenance

  • Duration: 3-month Yearly contracts (2009, 2008, 2007, 2006,
  • Total Value: US$1,000,001 - $2,000,000
  • Field: Concrete repair, stripping,
  • Market: Airport Infrastructure

 

Runway 8R/26L Pavement Replacement

Spall Repair and installation of dowels on a runway in Atlanta Airport.

  • Duration: 2 months
  • Total Value: Under US$500,000
  • Field: Concrete Work, Spall Repair
  • Market: Airport Infrastructure

 

Sinclair Dam Hydro 115KV

Reconstruction of an Oil Container Site at Sinclair Dam.

  • Duration: 1 month
  • Total Value: Under US$500,000
  • Field: Concrete Work
  • Market: Commercial and Institutional Building

 

Stonecrest Mall Floor Rehabilitation

This project consisted on replacing existing floor with decorative concrete.

  • Total Value: Under US$500,000
  • Field: Concrete work, concrete repair, acid-stained concrete, stamped concrete
  • Market: Decorative Concrete

 

Lindbergh Drive and Peachtree Hills Avenue

Under the City of Atlanta "Quality of Life Bond" program, this project improved the public areas for pedestrians and residents of Lindbergh Drive and Peachtree Hills Avenue. The project consisted in demolition and installation of new sidewalks, curbs, crosswalks, landscaping, and handicapped among other things.

  • Duration: 12 month
  • Total Value: US$1,000,001 - $2,000,000
  • Field: Streetscaping, Concrete, and Pavers
  • Market: Decorative Concrete

 

E.I.T. Embankment and Utilities Relocation Phase I – Taxiway “L” Extension Embankment, Phase II

This project involved construction of various items of work as the first step of the construction of the East International Terminal at the Atlanta's airport.

  • Duration: 15 months
  • Total Value: US$20,000,001 - $30,000,000
  • Field: Concrete Pavement, Foundations, Earthwork and Taxiway
  • Market: Airport Infrastructure

 

Bridge and Guardrail Rehabilitation

Precision 2000, Inc. worked in the rehabilitation of 13 vehicular bridges in Athens, Georgia.

  • Duration: 5 Months
  • Total Value: Under US$500,000
  • Field: Concrete Repair, Pavement, and Erosion Control
  • Market: Commercial and Institutional Building

 

Taxiway N5/M14 and Intersection Upgrades - Spall Repair

This project consisted in the widening of several intersections at the taxiway. The project included concrete pavement repair (or spall repair) in all taxiways and runways at the airport.

  • Duration: 7 months
  • Total Value: US$1,000,001 - $2,000,000
  • Field: Concrete Pavement, Spall Repair, Runway and Taxiway Repair
  • Market: Airport Infrastructure

 

Light Construction and Debris Removal, Package #6

Precision 2000, Inc. worked on this large project with the City of Atlanta to provide erosion control measures at multiple sites.

  • Duration: 12 Months
  • Total Value: US$2,000,001 - $4,500,000
  • Field: Erosion Control, Storm Water Lines, Concrete, Gabions and Landscaping.
  • Market: Commercial and Institutional Building

 

Security Fence and Guard Post Improvements

Replacementof the perimeter fencing and concrete paving of multiple vehicular entrances.

  • Duration: 6 months
  • Total Value: Under US$500,000
  • Field: Concrete, and Concrete Pavement
  • Market: Airport Infrastructure

 

East Atlanta Village Streetscape

This project is one among the community improvement projects throughout the City of Atlanta that are a part of the "Quality of Life Bond" Program.

  • Duration: 4 months
  • Total Value: US$500,001 - $1,000,000
  • Field: Streetscaping, Concrete, and Pavers
  • Market: Decorative Concrete