The first and most important Business Unit developed by Precision 2000, Inc. is Airport Infrastructure. The company has a highly qualified work team for developing projects in this area.
Since its beginning, Precision, 2000 Inc. has expanded its services and has received acknowledgment for its projects at the Hartsfield Atlanta International Airport.
This Airport is one of the biggest Airports in the US and the busiest in the world. It moves more than 6,000,000 of passenger, 65,000 cubic tons of cargo and attended 71,000 air operations per month. The airport has 1,500 hectares and four runways. In addition, the headquarters of Delta Airlines are located at the airport.
The company has a skilled team of engineers and managers who have wide knowledge about security rules, coordination with operations, fulfillment of construction standards, and safety at the airports. Our people are trained to work under strict restrictions of time, location, and access, found in construction projects at the airports. Precision 2000, Inc., has the premise that detailed planning and high quality management are the most important element for developing a project.
Airport Infrastructure Fields of Expertise
The projects executed by Precision 2000, Inc. in the Airport Infrastructure area, include the followings fields:

- Earthwork
- Concrete Pavement
- Foundations
- Flat Work
- Concrete Structures
- Concrete Repair and spall repair
- Erosion Control
- Taxiway, Runway, and Roads
Airports Infrastructure Projects
Since its beginnings, Precision 2000, Inc. has grown quickly and has received recognition for its work at Hartsfield Atlanta International Airport. Some projects performed at airports are:
Peachtree DeKalb Airport Runway Repair
Removal and replacement of 9500 SY of concrete slabs to the main runway at Peachtree Dekalb Airport in 2 night-work weeks and 17 days working 24/7.
- Duration: 31 days
- Value:
US$2,000,001 - $4,500,000
Airfield Pavement Repair/Maintenance
- Duration: 3-month Yearly contracts (2009, 2008, 2007, 2006,
- Value:
US$1,000,001 - $2,000,000
- Field:
Concrete repair, stripping,
Dobbins AFB Arresting System
This project consisted on the demolition of old arresting system and construction the new BAK12 arresting systemson both sides of the main runway.
- Duration: 3 months
- Value:
US$1,000,001 - $2,000,000
Non-licensed Vehicle Road
The project consist of the construction of a section of the NLVR for the 5th runway at Hartsfield - Jackson International Airport in Atlanta, Georgia.
- Duration: 6 months
- Value:
US$2,000,001 - $4,500,000
- Field:
Heavy Construction, Roads, Earthwork
Runway 8R/26L Pavement Replacement
Spall Repair and installation of dowels on a runway in Atlanta Airport.
- Duration: 2 months
- Value:
Under US$500,000
- Field:
Concrete Work, Spall Repair
E.I.T. Embankment and Utilities Relocation Phase I – Taxiway “L” Extension Embankment, Phase II
This project involved construction of various items of work as the first step of the construction of the East International Terminal at the Atlanta's airport.
- Duration: 15 months
- Value:
US$20,000,001 - $30,000,000
- Field:
Concrete Pavement, Foundations, Earthwork and Taxiway
Sams Lake Wetlands Mitigation
Project consisted of the construction of a wetlands habitat at Sams Lake in Fayette County, GA., along a tributary of the Flint River.
- Duration: 9 months
- Value:
US$1,000,001 - $2,000,000
- Field:
Earthwork and Erosion Control
Taxiway N5/M14 and Intersection Upgrades - Spall Repair
This project consisted in the widening of several intersections at the taxiway. The project included concrete pavement repair (or spall repair) in all taxiways and runways at the airport.
- Duration: 7 months
- Value:
US$1,000,001 - $2,000,000
- Field:
Concrete Pavement, Spall Repair, Runway and Taxiway Repair
Stormwater Detention Basins Maintenance
This project consisted on performing maintenance to the five stormwater detention basins at Hartsfield Atlanta International Airport. This basins collect rain water and regulate the volume of water exiting to natural channels.
- Duration: 5 months
- Value:
Under US$500,000
- Field:
Erosion Control and Earthwork
Aircraft Rescue and Firefighting Facilities - Phase I
Precision 2000, Inc. hydro-seeded and hydro-mulched the entire area (about 17 Acres) of the site that will be later used as an Aircraft Rescue and Firefighting Training facility at Hartsfield-Jackson Atlanta International Airport.
- Duration: 2 months
- Value:
Under US$500,000
- Field:
Erosion Control and Earthwork
Security Fence and Guard Post Improvements
Replacementof the perimeter fencing and concrete paving of multiple vehicular entrances.
- Duration: 6 months
- Value:
Under US$500,000
- Field:
Concrete, and Concrete Pavement
Non Licensed Vehicle Road (NLVR) Widening and Improvements
Improvement, extension, and rectification of the perimeter way at the Atlanta's Airport NLVR (No Licensed Vehicle Road)
- Duration: 6 Months
- Value:
US$500,001 - $1,000,000
- Field:
Earthwork, Roads, and Erosion Control
Consolidated Rental Car Facility - CONRAC
Precision 2000, Inc. performed the site preparation for the new Atlanta Hartsfield-Jackson Consolidated Rental Car Facility (CONRAC), for the construction of the Rental Agency Complex (RAC), certain portions of the Automated People Mover (APM) and the APM maintenance and storage facility which are part of the expansion of the airport.
- Duration: 9 Months
- Value:
US$8,000,001 - $15,000,000
- Field:
Earthwork, Utilities, Sewer Lines, Erosion Control
|