Aircraft Rescue and Firefighting Facilities - Phase I

Precision 2000, Inc. hydro-seeded and hydro-mulched the entire area (about 17 Acres) of the site that will be later used as an Aircraft Rescue and Firefighting Training facility at Hartsfield-Jackson Atlanta International Airport.

  • Duration: 2 months
  • Total Value: Under US$500,000
  • Field: Erosion Control and Earthwork
  • Market: Airport Infrastructure

 

Airfield Pavement Repair/Maintenance

Spall repair, joint and crack sealing, grading, striping and rubber removal at Hartsfield-Jackson International Airport.

  • Duration: 3-month Yearly contracts (2009, 2008, 2007, 2006,
  • Total Value: US$1,000,001 - $2,000,000
  • Field: Concrete repair, stripping,
  • Market: Airport Infrastructure

 

APM Pesdestrian Mall Inspection and Repairs

Interior repairs and renovations at Hartsfield-Jackson International Airport.

  • Total Value: US$1,000,001 - $2,000,000
  • Field: Concrete
  • Market: Airport Infrastructure

 

Bridge and Guardrail Rehabilitation

Precision 2000, Inc. worked in the rehabilitation of 13 vehicular bridges in Athens, Georgia.

  • Duration: 5 Months
  • Total Value: Under US$500,000
  • Field: Concrete Repair, Pavement, and Erosion Control
  • Market: Commercial and Institutional Building

 

Campbellton Road Widening and Improvements

Widening and improvements made to Campbellton Rd. in Southwest Atlanta

  • Field: Earth Work, Water Lines, Pavers, and Roads
  • Market: Commercial and Institutional Building

 

Center for Disease Control and Prevention (CDC) Micro Construction Contract

Interior repairs and renovations for 3 Atlanta CDC Campuses.

  • Duration: Annual contract since 2008
  • Total Value: US$2,000,001 - $4,500,000
  • Field: Renovations, Demolition, Concrete Flatwork, and Hardscaping
  • Market: Commercial and Institutional Building

 

Center of Disease Control and Prevention (CDC) Parking Lot Expansion

Expansion of the Southeast Parking Lot at the CDC's Roybal Campus.

  • Total Value: US$500,001 - $1,000,000
  • Field: Earthwork, Curb & Gutter, Asphalt, Striping and Landscaping
  • Market: Commercial and Institutional Building

 

Center of Disease Control and Prevention (CDC) Repair and Repave 5th and 6th Streets

Roadway repair and repaving at the CDC's Chamblee Campus.

  • Duration: 180 days
  • Total Value: US$500,001 - $1,000,000
  • Field: Asphalt and Concrete
  • Market: Commercial and Institutional Building

 

Center of Disease Control and Prevention (CDC) Transformer Bollards Project

Site preparation and relocation of transformer bollards at the CDC's Chamblee Campus.

  • Duration: 120 days
  • Total Value: Under US$500,000
  • Field: Concrete, Utilites, and Landscaping
  • Market: Commercial and Institutional Building

 

Consolidated Rental Car Facility - CONRAC

Precision 2000, Inc. performed the site preparation for the new Atlanta Hartsfield-Jackson Consolidated Rental Car Facility (CONRAC), for the construction of the Rental Agency Complex (RAC), certain portions of the Automated People Mover (APM) and the APM maintenance and storage facility which are part of the expansion of the airport.

  • Duration: 9 Months
  • Total Value: US$8,000,001 - $15,000,000
  • Field: Earthwork, Utilities, Sewer Lines, Erosion Control
  • Market: Airport Infrastructure

 

Covington Highway Roadway and Pedestrian Safety Upgrades

Pedestrian improvements along Covington Highway.

  • Duration: 1 year
  • Total Value: US$500,001 - $1,000,000
  • Field: Earthwork, Roads, and Concrete
  • Market: Commercial and Institutional Building

 

Dahlberg Plant

The project was located at Dahlberg plant in Nicholson, Georgia. The project included mass excavation, utilities, installed piping, and landscaping.

  • Duration: 1 month
  • Total Value: Under US$500,000
  • Field: Earthwork Erosion Control, and Utility work
  • Market: Commercial and Institutional Building

 

Dobbins AFB Arresting System

This project consisted on the demolition of old arresting system and construction the new BAK12 arresting systemson both sides of the main runway.

  • Duration: 3 months
  • Total Value: US$1,000,001 - $2,000,000
  • Market: Airport Infrastructure

 

E.I.T. Embankment and Utilities Relocation Phase I – Taxiway “L” Extension Embankment, Phase II

This project involved construction of various items of work as the first step of the construction of the East International Terminal at the Atlanta's airport.

  • Duration: 15 months
  • Total Value: US$20,000,001 - $30,000,000
  • Field: Concrete Pavement, Foundations, Earthwork and Taxiway
  • Market: Airport Infrastructure

 

East Atlanta Village Streetscape

This project is one among the community improvement projects throughout the City of Atlanta that are a part of the "Quality of Life Bond" Program.

  • Duration: 4 months
  • Total Value: US$500,001 - $1,000,000
  • Field: Streetscaping, Concrete, and Pavers
  • Market: Decorative Concrete

 

Georgia Power Ash Pond Closure

This project took place at Plant Arkwright, Georgia Power’s former plant and included a first phase of stabilization of slopes surrounding Ash Pond 1.

  • Duration: 9 Months
  • Total Value: US$1,000,001 - $2,000,000
  • Field: Mass Excavation, Erosion Control, and Gabions
  • Market: Commercial and Institutional Building

 

GSA Restoration of Historical Buildings in Charleston, SC

Interior and exterior historical renovations.

  • Duration: 2 months
  • Total Value: Under US$500,000
  • Field: Renovation
  • Market: Commercial and Institutional Building

 

Kaiser Permanente Renovations

Interior renovations to the DeKalb Tech Advice Call Center, East Cobb MOB, and Gwinnett Cardiology Center.

  • Total Value: US$1,000,001 - $2,000,000
  • Field: Demolition, Concrete, and Renovations
  • Market: Commercial and Institutional Building

 

Light Construction and Debris Removal, Package #6

Precision 2000, Inc. worked on this large project with the City of Atlanta to provide erosion control measures at multiple sites.

  • Duration: 12 Months
  • Total Value: US$2,000,001 - $4,500,000
  • Field: Erosion Control, Storm Water Lines, Concrete, Gabions and Landscaping.
  • Market: Commercial and Institutional Building

 

Lindbergh Drive and Peachtree Hills Avenue

Under the City of Atlanta "Quality of Life Bond" program, this project improved the public areas for pedestrians and residents of Lindbergh Drive and Peachtree Hills Avenue. The project consisted in demolition and installation of new sidewalks, curbs, crosswalks, landscaping, and handicapped among other things.

  • Duration: 12 month
  • Total Value: US$1,000,001 - $2,000,000
  • Field: Streetscaping, Concrete, and Pavers
  • Market: Decorative Concrete

 

Non Licensed Vehicle Road (NLVR) Widening and Improvements

Improvement, extension, and rectification of the perimeter way at the Atlanta's Airport NLVR (No Licensed Vehicle Road)

  • Duration: 6 Months
  • Total Value: US$500,001 - $1,000,000
  • Field: Earthwork, Roads, and Erosion Control
  • Market: Airport Infrastructure

 

Non-licensed Vehicle Road

The project consist of the construction of a section of the NLVR for the 5th runway at Hartsfield - Jackson International Airport in Atlanta, Georgia.

  • Duration: 6 months
  • Total Value: US$2,000,001 - $4,500,000
  • Field: Heavy Construction, Roads, Earthwork
  • Market: Airport Infrastructure

 

Peachtree DeKalb Airport Runway Repair

Removal and replacement of 9500 SY of concrete slabs to the main runway at Peachtree Dekalb Airport in 2 night-work weeks and 17 days working 24/7.

  • Duration: 31 days
  • Total Value: US$2,000,001 - $4,500,000
  • Market: Airport Infrastructure

 

Robins AFB "Green" Parking Lot Project

"Green" grass pave and pervious concrete parking lot.

  • Duration: 90 days
  • Total Value: US$500,001 - $1,000,000
  • Field: Earthwork, Pervious Concrete, Grass Pavement, Curb & Gutter, Landscaping
  • Market: Commercial and Institutional Building

 

Sams Lake Wetlands Mitigation

Project consisted of the construction of a wetlands habitat at Sams Lake in Fayette County, GA., along a tributary of the Flint River.

  • Duration: 9 months
  • Total Value: US$1,000,001 - $2,000,000
  • Field: Earthwork and Erosion Control
  • Market: Airport Infrastructure

 

Security Fence and Guard Post Improvements

Replacementof the perimeter fencing and concrete paving of multiple vehicular entrances.

  • Duration: 6 months
  • Total Value: Under US$500,000
  • Field: Concrete, and Concrete Pavement
  • Market: Airport Infrastructure

 

Sidewalks, Driveways and Curbs in Atlanta

This project consists on the construction and repair of sidewalks throught the City of Atlanta.

  • Duration: Annual contract since 2003
  • Total Value: US$4,500,001 - $8,000,000
  • Field: Streetscaping, Concrete, and Pavers
  • Market: Commercial and Institutional Building

 

Sinclair Dam Hydro 115KV

Reconstruction of an Oil Container Site at Sinclair Dam.

  • Duration: 1 month
  • Total Value: Under US$500,000
  • Field: Concrete Work
  • Market: Commercial and Institutional Building

 

Spalding Drive Charter Elementary School Sidewalk Project

Pedestrian improvements along Spalding Drive.

  • Duration: 90 days
  • Total Value: Under US$500,000
  • Field: Earthwork, Concrete, Storm Water Lines and Landscaping
  • Market: Commercial and Institutional Building

 

Stonecrest Mall Floor Rehabilitation

This project consisted on replacing existing floor with decorative concrete.

  • Total Value: Under US$500,000
  • Field: Concrete work, concrete repair, acid-stained concrete, stamped concrete
  • Market: Decorative Concrete

 

Stormwater Detention Basins Maintenance

This project consisted on performing maintenance to the five stormwater detention basins at Hartsfield Atlanta International Airport. This basins collect rain water and regulate the volume of water exiting to natural channels.

  • Duration: 5 months
  • Total Value: Under US$500,000
  • Field: Erosion Control and Earthwork
  • Market: Airport Infrastructure

 

Sugar Mill Creek

The project consisted of the Mill Creek Subdivision Phase II for Dekalb Housing Authority. The work performed included asphalt concrete paving, installation of water and sewer system, and erosion control.

  • Duration: 8 months
  • Total Value: US$1,000,001 - $2,000,000
  • Field: Earthwork, Erosion Control, and Utility Work
  • Market: Commercial and Institutional Building

 

Taxiway N5/M14 and Intersection Upgrades - Spall Repair

This project consisted in the widening of several intersections at the taxiway. The project included concrete pavement repair (or spall repair) in all taxiways and runways at the airport.

  • Duration: 7 months
  • Total Value: US$1,000,001 - $2,000,000
  • Field: Concrete Pavement, Spall Repair, Runway and Taxiway Repair
  • Market: Airport Infrastructure

 

Unpaved Streets

This project consisted on improving 15 unpaved streets in the metro Atlanta area for the City of Atlanta. Improvements consisted of installing drainage systems, curb, sidewalks, grassing, tree planting and asphalt pavement.

  • Duration: 18 months
  • Total Value: US$4,500,001 - $8,000,000
  • Market: Commercial and Institutional Building